Today’s pumping applications demand better and more efficient self-priming, solids-handling pumps. At Gorman-Rupp, providing greater performance and reducing installation and maintenance costs have always been their ultimate goals. This makes the Ultra V one of the best values introduced to the pump industry in decades. This next generation of solids-handling, self-priming centrifugal pumps offers substantially higher pressures, flows, efficiencies and time-saving maintenance features, all in one package.
Gorman-Rupp Ultra V Self-Priming Pumps achieve up to 60% increased pressure and 40% increased flow over traditional self-priming trash pumps of the same size, while substantially increasing overall pumping efficiency.
Sizes
- 3″ (75 mm)
- 4″ (100 mm)
- 6″ (150 mm)
- Max Capacity: 1950 GPM (123 lps)
- Max Head: 325′ (99 m)
- Max Solids: 3″
Item | Size | Casing | Impeller / Rotor | Drive | Flange | Seal |
V3A60-B | 4 x 3 | Cast Iron | Ductile Iron | Basic | ASA | Silicon Carbide |
V3B60-B | 4 x 3 | Cast Iron | Ductile Iron | Basic | ASA | Silicon Carbide |
V4A60-B | 6 x 4 | Cast Iron | Ductile Iron | Basic | ASA | Silicon Carbide |
V6A60-B | 8 x 6 | Cast Iron | Ductile Iron | Basic | ASA | Silicon Carbid |
Materials of Construction
- Cast Iron
Applications Include
- Pumping solids
- Pumping sludge
- Pumping wastewater
- Pumping industrial wastewater
- Pumping slurries
- Sump pump
- Pumping drilling mud
- Pumping frac water
- Pumping waste oil
- De-watering pump
Interchangeable With
- Cornell
- Pioneer
- Weir Self Priming
For more information contact us at:1-877-624-5757
Ultra V Series Pump Maintenance Pt. 1 – Safety and Preventive Maintenance .
.Ultra V Series Pump Maintenance Pt. 2 – Back Cover and Wear Plate Removal .
Ultra V Series Pump Maintenance Pt. 3 – Suction Check Valve Removal
Ultra V Series Pump Maintenance Pt. 4 Rotating Assembly Removal
Ultra V Series Pump Maintenance Pt. 5 – Seal, Shaft and Bearing Removal
Ultra V Series Pump Maintenance Pt. 6 – Seal Installation
Ultra V Series Pump Maintenance Pt. 7 – Impeller Installation and Adjustment
Ultra V Series Pump Maintenance Pt. 8 – Rotating Assembly Installation .
.Ultra V Series Pump Maintenance Pt. 9 – Back Cover Installation and Adjustment .
Ultra V Series Pump Maintenance Pt. 10 – Pressure Relief Valve .
Ultra V Series Pump Maintenance Pt. 11 – Final Pump Assembly .